Belmont Road & Metra/BNSF Grade Separation

Topline Community Benefits

Improved reliability for over 130 freight and passenger trains. 

Increased utilization of the space for multimodal users, including pedestrians.

Safer roadway conditions and upgraded infrastructure.

Project Funding Needs

CREATE gauges 05
Fully funded and complete

Project Location Map

This map highlights the project's location within the region. 

To learn more about other CREATE projects, zoom out to explore the map.   

Municipality

Downers Grove

Project Area

North Limit Haddow Ave.
South Limit Hitchcock Ave.
East Limit Pershing Ave.
West Limit Puffer Rd.

Project Overview & Impact

A completed grade separation of the Belmont Road and Metra/BNSF tracks has improved the crossing by reducing the roadway congestion and upgrading the multimodal design of the infrastructure. Belmont Road now consists of two lanes of traffic in either direction, with a tunnel for pedestrians on the west side of Belmont Road.

This project increased safety by eliminating the risk of a collision between trains and motorists, pedestrians or bicyclists. More than 140 trains pass through this location every day, and no longer block traffic on Belmont Road, which handles approximately 18,000 vehicles per day. Because vehicles no longer sit idling and waiting for trains to cross, vehicular emissions are reduced, improving the quality of life for area residents. 

GS7 photo

Project Benefits

The Belmont Road and Metra/BNSF Grade Separation delivers substantial time saving, safety improvements, and mobility gains for the local community and passenger/ freight rail operators..  The grade crosing separation enables greater accessibility and safety in the area.

Nearby Chicago, IL Community Areas: Downers Grove

This crossing’s improvements will boost local and regional economic throughput by ensuring steady freight and commuter service.

Localized environmental improvments from vehicle and locomotive idling reductions. Enhanced local ambience.

More reliable commuter rail service for over 130 Metra and Amtrak trains. As well, access to a proposed relocated Metra station was improved.

Get Involved

Project Status

Phase I Completed
Phase II Completed
Phase III Completed

Project Status Definitions:
– Phase I: Environmental & Preliminary Engineering
– Phase II: Final Design (Plans, Specifications & Estimates)
– Phase III: Construction

group of 5 men standing infront of shiping containers

Stay Informed About These Projects

Want to stay in the know? Sign up for the CREATE newsletter to receive the latest project updates and ongoing project information.