; Canadian Pacific Crossover Upgrades - CREATE Program

Our Projects

Beltway Corridor
B1

Canadian Pacific Crossover Upgrades

LocationCreated with sketchtool.

Location

North Limit Franklin St.
South Limit Grand Ave.
East Limit Des Plaines River Rd.
West Limit Mannheim Rd.
trainCreated with sketchtool.

Daily Trains Affected

12 freight trains (CP)

58 Metra trains (Milwaukee District West)

Communities Benefited:

  • Franklin Park

Benefits

Prior to this project’s completion, freight trains had to pass through the Bensenville Yard to access IHB main line track. With this improvement, 12 daily through freight trains are able to bypass the Canadian Pacific Railroad Bensenville Yard on existing Metra tracks. This project reduces the number of freight trains within the yard and reduce delays at nearby at-grade crossings. The potential for delay to Metra trains due to conflict with slow moving freight trains entering the yard is reduced.

Wheel in Motion 1 1
Wheel in Motion 1 1
rail inspection

Scope of Work

Install five crossovers and associated signaling on the Metra tracks serving the Metra Milwaukee District West Line and Canadian Pacific. Install another crossover between the IHB and CN tracks. A crossover is a pair of switches that connects two parallel rail tracks, allowing a train on one track to cross over to the other.

Project Status

Phase I Completed
Phase II Completed
Phase III Completed
group of 5 men standing infront of shiping containers

Project Location Map

Project outlines and locations shown above are approximations and do not necessarily represent final design and construction limits.