; Forest Hill Flyover (75th Street Corridor Improvement Project) - CREATE Program

Our Projects

Passenger Corridor
P3

Forest Hill Flyover (75th Street Corridor Improvement Project)

LocationCreated with sketchtool.

Location

North Limit 69th St
South Limit 100th St.
East Limit Dan Ryan Expressway I-90/94
West Limit Central Park Ave.
trainCreated with sketchtool.

Daily Trains Affected

90 freight trains (CSX, NS, UP, BRC, CN, CP)

30 Metra trains (SouthWest Service)

2 Amtrak trains (Cardinal Service)

Communities Benefited:

  • City of Chicago Community Areas: Auburn Gresham, Chatham, Englewood, Greater Grand Crossing, Ashburn, Gresham, Chicago Lawn, West Englewood, Roseland, and Washington
    Heights

  • Communities along the Metra SouthWest Service Line

  • Cook County and Will County

Benefits

The Forest Hill Flyover (P3) is constructing a bridge that will eliminate or significantly reduce conflicts between BRC, CSX, NS and Metra trains. The rail-rail flyover at 75th Street will eliminate conflict between 30 SouthWest Service Metra trains and 35 freight trains operating daily on the Western Avenue Corridor (CSX). This project will reduce freight train and Metra delays and increase fluidity of rail service.

Wheel in Motion 1 1
Wheel in Motion 1 1
rail inspection

Scope of Work

Alternatives are being developed to address conflicts between CSX, BRC, UP, NS and Metra. The approach will consider reconfiguring the Belt Railway of Chicago (BRC) main tracks between the Dan Ryan Expressway and Belt Junction, where four freight railroads conflict with each other and Metra’s SouthWest Service operations (EW2). The project will consider constructing a second main track for Metra’s SouthWest Service operations from near Wrightwood Station to Western Avenue (P2). The project will consider reconfiguring and building a third BRC main track, and constructing a flyover to connect the Metra SouthWest Service to the Rock Island Line in the vicinity of 74th and Normal and 75th and Parnell (EW2 and P2). This project will consider constructing a bridge that significantly reduces conflicts between CSX and BRC, Metra and NS (P3). The project will also consider constructing a road-rail grade separation of 71st St. and the CSX freight line (GS19). Associated signals, tracks, crossovers, and bridge work are included in the project. See the project website for more information at: https://www.75thcip.org/

Project Status

Phase I Completed
Phase II Completed
Phase III Underway
group of 5 men standing infront of shiping containers

Project Location Map

Project outlines and locations shown above are approximations and do not necessarily represent final design and construction limits.